Skip to content
My inquiry(0)

JUMING / Resources

Specify a steel profile

A model name alone is not enough for a production quotation.

Why is a series name insufficient for a quotation?

The dealer sheet lists several single-sided, double-sided and finish variants of the 88 triangular profile. Include the complete model name and listed specification with the required section drawing so different entries are not treated as one product.

Which dimensions and materials need confirmation?

Provide cross-section dimensions, thickness, piece length, material or finish and required tolerances. Do not infer missing values from an image, series number or historical price. The confirmed drawing and quotation define the final specification.

How should metres, pieces and sets be stated?

Keep the reference unit shown on the product page and add the total required quantity. At 3 m per piece, 300 m equals 100 pieces before waste; allow separately for cutting, overlaps and project waste. A 2.8 m/piece entry needs a different calculation.

Why are prices not shown?

Prices depend on model, specification, quantity and delivery point. Request a quotation to confirm tax, packing and freight.

What belongs in a complete request?

List the name, listed specification, drawing revision, required length, quantity and unit for each item. Add the delivery point and target date. Keep unresolved dimensions as questions for sales before approving the final details.

Delivery and quotation

For an export request, state the destination country and city or port separately. Confirm units, packing, piece lengths, trade terms and freight coverage. Historical RMB prices are not landed export prices.

Prepare an export inquiry →

Specification and price source

Names, listed specifications and reference units are transcribed from the dealer sheet dated 1 March 2026. The sheet does not replace dimensional drawings, test documents or a current quotation.